Solar Vault designed, engineered, and installed this advanced Solar Battery Energy Storage System. Spanning three buildings, the system includes 1,075 x 550W PV modules, supplying 552kWp of solar power. It features:
- 500kW AC-coupled BESS with 1,258kWh of battery storage for the Sandton and Randburg buildings
- A separate 150kW BESS with 318kWh storage powers the Rainbow building.
The result: a highly efficient, sustainable energy solution.
| Client | Wilson Bayly Holmes Ovcon (WBHO Construction) |
| Location | WBHO Chloorkop |
| Size | 306.7 kWp |
| Type | Grid-tie |
| Installation Date | September 2022 |
| Installation Duration | 8 weeks |




